BIM
3D modeling
- 3D modeling of architecture, building installation, equipment and interior design
- Consulting in the field of CAD and BIM software
Collision tests
- Inter-branch tests carried out on models of individual components of the project, allowing the capture of almost all possible collisions on the construction site.
- Capturing such collisions at the planning stage allows us to optimize investment costs and has a positive impact on their formation time.
BIM process management
A process which benefits all the involved parties, i.e. the investor, the designer and the contractor. It allows the investor to actively participate in the creation process from the very beginning of the project, and to have an impact on its final shape. Thanks to BIM, the investor may introduce any project changes at an early stage. In addition, due to a properly made 3D model, it is easier to verify schedules and compare cost estimates in order to choose the best offer.
BIM significantly facilitates communication between the investor and the designer as well as the designer and the contractor. It allows for a more accurate division of roles and prevents blurring of responsibility during construction and the rest of the building’s life cycle. BIM affects the transparency of construction processes and increases competitiveness in global and local markets.
Facility management systems
A duly prepared BIM model has a beneficial effect on the final price of the investment and the cost of maintaining the facility. For the building manager, the benefit of introducing the managed BIM process is the continuous access to documentation and no loss of information about the facility over time. Due to the documentation received, the manager is able to better organize repairs and necessary inspections.