Location: Września
Implementation of the design and building supervision at a production plant construction
The construction area – 300,000m2
In the years 2013-2017
IT infrastructure:
- 2 server rooms (500m2 )
- 5 network distribution rooms
- 9 technical rooms
- 80,000m of optical fibers
- 350,000m of copper cables
- About 6,500 network data outlets
- Full coverage of the WIFI wireless network
CCTV:
Designing a monitoring system in the area of 110ha along with monitoring of high-risk areas.
Fire alarm systems:
- The system provides full coverage for fire protection on 300,000m2.
- 22 fire alarm control panels connected in a ring by optical fiber.
- Fire control matrix for the plant
Access Control:
- Designing an access control system for 110 doors, 23 controllers.
- Safe evacuation system (RWS) for 8 passages.
Video conferencing systems:
- 6 small and medium-size video conferencing systems.
- 1 system for large product presentations and large size assemblies
of 950m2
DMR system:
Design and supervision over the construction of a system ensuring radio communication for factory security services and communication using
IP technology with an integrated monitoring center.
GSM system:
Supervision over the development of GSM infrastructure ensuring full coverage of the LTE network in the plant premises.