Location: Września

Implementation of the design and building supervision at a production plant construction

The construction area – 300,000m2
In the years 2013-2017

IT infrastructure:
  • 2 server rooms (500m2 )
  • 5 network distribution rooms
  • 9 technical rooms
  • 80,000m of optical fibers
  • 350,000m of copper cables
  • About 6,500 network data outlets
  • Full coverage of the WIFI wireless network
CCTV:

Designing a monitoring system in the area of 110ha along with monitoring of high-risk areas.

Fire alarm systems:
  • The system provides full coverage for fire protection on 300,000m2.
  • 22 fire alarm control panels connected in a ring by optical fiber.
  • Fire control matrix for the plant
Access Control:
  • Designing an access control system for 110 doors, 23 controllers.
  • Safe evacuation system (RWS) for 8 passages.
Video conferencing systems:
  • 6 small and medium-size video conferencing systems.
  • 1 system for large product presentations and large size assemblies
    of 950m2
DMR system:

Design and supervision over the construction of a system ensuring radio communication for factory security services and communication using
IP technology with an integrated monitoring center.

GSM system:

Supervision over the development of GSM infrastructure ensuring full coverage of the LTE network in the plant premises.